slow but steady?
bottom mod- check
x-2 tubbies- check
new coil wires installed- check
wiring all cleaned up- two more connectors and epoxy then check
tuneable pipe screws removed- check
factory pipe fitted, fuel tank modded, hose and clamps for pipe- check
pump liner replaced, pump aligned and installed - check
dual bilge bracket fabbed and installed-check
still waiting for some small epoxy work and engine install and exhaust exit work...
hood mods and maybe glass up a rideplate or 3 to d-cut???
vumad- what else is there aside from winning the lotto so we can ride?:dunno: