pics of wammer ski done.

heres what is goin in the ski.

Bad bones girdle head flat topped
Riva girdle studs 10mm
Carbon fiber head and base gaskets
Hot Rods crank
Pro-X pistons machined Flat tops-336 grams matched set 82mm
half moon cut into bottom of pistons
Moon cut mached to cylinder sleeves
Ported 62T cylinder
Epoxied stuffed and ported 62t cases
Delta V-Force ll reeds
Porting favors low end on this one that what is setup for low end and mid
Exhaust port widening kept at 70% of bore width, port height was not raised
Dual 44’s SBN’s with prok flame aressters. and adaptors
Riva anodized spacer plate
FPP B mod pipe
dual exhaust w/TDR powerspray waterbox
carbon front exhaust outlet
Stock pump and nozzles "blue printed"
Stubby cone
Solos 13/17 concord prop setback
Duel cooling lines
MSD enhanscer
MSD stock improved coil
MSD plug wires and plug caps
WSM starter
Waterdawg Kustomz diablo hood/nose/billet latch
X-metal -4 pole kit with -2.5 inch steering system/straight bars + CG racing carbon chinpad and ODI grips—dual breather system
24/7 scupper
blowsion kickers
OEM hoodseal
blowsion aluminum battery box
Limiting rope
Fuel area filled and glassed with internal fuel filler
24/7 hoodhooks
JSS bulb style primer
Sato finger throttle
Blowsion bilge switch
Dueling rule 360’s with blowsion bracket
Wammer D cut carbon fiber rideplate
work 201 intake grate
 

Attachments

  • STA74906.jpg
    STA74906.jpg
    70.5 KB · Views: 289
  • STA74908.jpg
    STA74908.jpg
    94.8 KB · Views: 310
  • STA74910.jpg
    STA74910.jpg
    80.6 KB · Views: 363
  • IMG_0045#1.jpg
    IMG_0045#1.jpg
    115.2 KB · Views: 147
  • IMG_0041#2.jpg
    IMG_0041#2.jpg
    83.8 KB · Views: 182
Last edited:
im just gonna get it out on the water and ill do the paint and all the little stuff when i put a different motor in there in like 6 months.
 
yea thats the way to go ill be building my colorfull ski this winter as well
got the engine done now its time for cosmetics

good luck with the hull im sure it'll rip
whats the weight??
 

Jr.

Standing Tall
Staff member
Site Supporter
Location
Hot-Lanta
Nice job Sean :hail:




Yes, I sell Wamiltons products............
Hulls are by special order
 
the ski is almost done hopeing to have it running by monday. just waiting on a few parts. will add some more pics later, and finished the turf yesterday.
 

Attachments

  • IMG_0041#2.jpg
    IMG_0041#2.jpg
    83.8 KB · Views: 105
  • IMG_0043#4.jpg
    IMG_0043#4.jpg
    98.5 KB · Views: 109
  • IMG_0044#3.jpg
    IMG_0044#3.jpg
    103.6 KB · Views: 97
  • IMG_0045#1.jpg
    IMG_0045#1.jpg
    115.2 KB · Views: 62
ok now all the little stuff is done now im gonna be putting the pump, motor, mid shaft ect. ski sould be running very soon!!!!
 
Top Bottom