WCF project.

This is a project that dates back to the end of 2006. I have been working on this an hour or five at a time. With my work shcedule it has been tough and like most of you putting to gether these projects, late nights. Here is the set up for now. The last picture of the hull is when I first recieved it.
701 62-T
B-PIPE (I DO NOT KNOW HOW TO TELL IF IT IS MOD OR LIMITED)
DUAL 46' MIKUNI WITH R&D INTAKE AND SPACER
CARBON REEDS WITH OEM CAGES
RIVA GIRDLE HEAD WITH 35CC DOMES
INTERNAL DUAL FUEL PICKUP WITH DUAL PULSE FITTINGS. (I INSTALLED THE SECOND ONE)
MSD ENHANCER (I HOPE I WIRE IT RIGHT, THE DIAGRAM SUCKED)
BILGE PUMP
WATERDAWGZ STEERING SYSTEM (NOT UMI)
WATERDAWGZ BARS
LIZARD SKIN GRIPS WITH ODI LOCKS. (12 BUCKS AT OUT DOOR STORE)
 

Attachments

  • yellow and blue ski's 004.jpg
    yellow and blue ski's 004.jpg
    107.2 KB · Views: 61
  • yellow and blue ski's 002.jpg
    yellow and blue ski's 002.jpg
    77.2 KB · Views: 79
  • new hull 003.jpg
    new hull 003.jpg
    63.9 KB · Views: 100
Here are some pic's of the Waterdawgz steering.
 

Attachments

  • new hull 001.jpg
    new hull 001.jpg
    53.7 KB · Views: 48
  • new hull 002.jpg
    new hull 002.jpg
    36.7 KB · Views: 45
Top Bottom