Hey all..
Picked up a 1993 SN Superjet and a bunch of extra parts. The nose is a little rockered (This is my first non-Kawi) or at least it appears to be to me. The hull is completely bare besides the sides being reinforced, 4 brand new motor mounts and a brand new midshaft/thru hull bearing.
I sold off the B-Pipe chamber and the Protec headpipe/chamber that came with the ski, as well as two spare handlepoles which basically made me break even on what I spent for the whole package. I am looking to now assemble it with all the stock parts that came with the ski. There is an MSD enhancer that is already in the ebox, so I think I'll keep it.
There are some items I am missing, such as the start/stop assembly, throttle cable. etc. other than that, I think I can get the ski about 90% complete with what I have.
This will be a lengthy project for me, as I only get a few hours every few nights to work on it. So bare with me, but I will also have a TON of questions to ask. Hoping to have this water ready by the beginning of the new year.
Here are some pics, I picked up all the parts last week but not the ski yet, due to work schedule and going to pick up my trailer.
I should pick up the ski one night this week.
The engine is a 62T/62T
Picked up a 1993 SN Superjet and a bunch of extra parts. The nose is a little rockered (This is my first non-Kawi) or at least it appears to be to me. The hull is completely bare besides the sides being reinforced, 4 brand new motor mounts and a brand new midshaft/thru hull bearing.
I sold off the B-Pipe chamber and the Protec headpipe/chamber that came with the ski, as well as two spare handlepoles which basically made me break even on what I spent for the whole package. I am looking to now assemble it with all the stock parts that came with the ski. There is an MSD enhancer that is already in the ebox, so I think I'll keep it.
There are some items I am missing, such as the start/stop assembly, throttle cable. etc. other than that, I think I can get the ski about 90% complete with what I have.
This will be a lengthy project for me, as I only get a few hours every few nights to work on it. So bare with me, but I will also have a TON of questions to ask. Hoping to have this water ready by the beginning of the new year.
Here are some pics, I picked up all the parts last week but not the ski yet, due to work schedule and going to pick up my trailer.
I should pick up the ski one night this week.
The engine is a 62T/62T