Buried

Matt_E

steals hub caps from cars
Site Supporter
Location
at peace
So.....it occured to me yesterday that the PNW winter is coming to a close, fast. :banghead:

I have slightly less than 4 weeks now to get my ******** together for the Long Beach freeride (March 23-25).
Let's see......
My Roundnose:
-Got to finish the foothold swap. I cut out one of the old holds. I still need to get the other out, install the REV's, and returf.
-I was going to install a dual breather XMW bracket, but I don't think I have the time (it's single right now)
-I need replace one bilge pump


Squarenose:
-I need to finish that dam hull. That means fixing the pump shoe, building a nose, fitting the XMW bracket and FX1 pole, install a one way valve, close the back up, refoam, modify the hood.
-I need to tear the engine apart, port the cylinders and cases, install a pipe, and tune. Oh, gotta turf, too.

Misc
-I need to build a 760 Frankenstein that will be my Surf Motor (since I really don't want to dick around with my current Roundnose motor and total loss - I'd rather just have complete drop-in)

I will need to spend at least a couple of days tuning my setups and Phill's setups. Probably Snackem's setups, too.

And next weekend, I got 1000 sqft of laminate flooring to install,and another 120sqft of tile.
And in between all that, I need to find a couple hours for my job and school. :arms:

But hey, I do it for the children. :biggthumpup:
 

Snackem

Danger Zone
Location
Colfax WA
So.....it occured to me yesterday that the PNW winter is coming to a close, fast. :banghead:

I have slightly less than 4 weeks now to get my ******** together for the Long Beach freeride (March 23-25).
Let's see......
My Roundnose:
-Got to finish the foothold swap. I cut out one of the old holds. I still need to get the other out, install the REV's, and returf.
-I was going to install a dual breather XMW bracket, but I don't think I have the time (it's single right now)
-I need replace one bilge pump


Squarenose:
-I need to finish that dam hull. That means fixing the pump shoe, building a nose, fitting the XMW bracket and FX1 pole, install a one way valve, close the back up, refoam, modify the hood.
-I need to tear the engine apart, port the cylinders and cases, install a pipe, and tune. Oh, gotta turf, too.

Misc
-I need to build a 760 Frankenstein that will be my Surf Motor (since I really don't want to dick around with my current Roundnose motor and total loss - I'd rather just have complete drop-in)

I will need to spend at least a couple of days tuning my setups and Phill's setups. Most importantly Snackem's setups, too.

And next weekend, I got 1000 sqft of laminate flooring to install,and another 120sqft of tile.
And in between all that, I need to find a couple hours for my job and school. :arms:

But hey, I do it for the children. :biggthumpup:


I'm touched that you though of me:biggthumpup:
 

Mark44

Katie's Boss
Location
100% one place
You just thought of this? LOL

I refoamed added drains new footholds scupper valve trim system and turf and reeds on Katie's ski and mine got new front exhaust outlet. I will replace the bottom tray turf and pad also pull the motor and elec. just to check things out.


Mark44
 

Mouthfulloflake

ISJWTA member #2
Location
NW Arkansas
I feel your pain brother.

my list is similar, except im taking classes as well, 2 out of 3 cars are down for service, im busy as HELL at work, sons needs my help building his pinewood derby car for next weekend....

Not to mention the 2 boats I need to paint, and engines to build... my only goal is to have them done by april or so.



So.....it occured to me yesterday that the PNW winter is coming to a close, fast. :banghead:

I have slightly less than 4 weeks now to get my ******** together for the Long Beach freeride (March 23-25).
Let's see......
My Roundnose:
-Got to finish the foothold swap. I cut out one of the old holds. I still need to get the other out, install the REV's, and returf.
-I was going to install a dual breather XMW bracket, but I don't think I have the time (it's single right now)
-I need replace one bilge pump


Squarenose:
-I need to finish that dam hull. That means fixing the pump shoe, building a nose, fitting the XMW bracket and FX1 pole, install a one way valve, close the back up, refoam, modify the hood.
-I need to tear the engine apart, port the cylinders and cases, install a pipe, and tune. Oh, gotta turf, too.

Misc
-I need to build a 760 Frankenstein that will be my Surf Motor (since I really don't want to dick around with my current Roundnose motor and total loss - I'd rather just have complete drop-in)

I will need to spend at least a couple of days tuning my setups and Phill's setups. Probably Snackem's setups, too.

And next weekend, I got 1000 sqft of laminate flooring to install,and another 120sqft of tile.
And in between all that, I need to find a couple hours for my job and school. :arms:

But hey, I do it for the children. :biggthumpup:
 

Phill

v Check out Little Matt_E
Location
Kennewick, WA
So.....it occured to me yesterday that the PNW winter is coming to a close, fast. :banghead:

I have slightly less than 4 weeks now to get my ******** together for the Long Beach freeride (March 23-25).
Let's see......
My Roundnose:
-Got to finish the foothold swap. I cut out one of the old holds. I still need to get the other out, install the REV's, and returf.
-I was going to install a dual breather XMW bracket, but I don't think I have the time (it's single right now)
-I need replace one bilge pump


Squarenose:
-I need to finish that dam hull. That means fixing the pump shoe, building a nose, fitting the XMW bracket and FX1 pole, install a one way valve, close the back up, refoam, modify the hood.
-I need to tear the engine apart, port the cylinders and cases, install a pipe, and tune. Oh, gotta turf, too.

Misc
-I need to build a 760 Frankenstein that will be my Surf Motor (since I really don't want to dick around with my current Roundnose motor and total loss - I'd rather just have complete drop-in)

I will need to spend at least a couple of days tuning my setups and Most importantly Phill's setups. Probably Snackem's setups, too.

And next weekend, I got 1000 sqft of laminate flooring to install,and another 120sqft of tile.
And in between all that, I need to find a couple hours for my job and school. :arms:

But hey, I do it for the children. :biggthumpup:

I'm touched that you though of me:biggthumpup:



Fixed that for you Snacko
 
Top Bottom