2010 edition winter project
(this was 2009)
I'm planning a build on my 98 sxi pro to install footholds and refoam and will be doing a few other things while its all ripped apart
in all i will be doing these things
1. New foam (sealing everything and maybe glassing inside rail)
2. Footholds
3. closing holes from fire extinguisher tubes
4. installing a footstrap
5. sealing leaky holes from removed hull extensions (i'm gonna put threaded inserts in so i can take them on and off)
6. turfing
i'm only in the planning process and want to be prepared so don't have to go back in and redo anything.
my main question involves the tray,foam,and footholds.
i have seen a few ways of doing the main parts but i wonder what you all think the best way to do it is
1. Pour foam,shape for tray, lay down a new tray, then do a traditional install for the footholds.
1b. pour foam shape for holds and tray. then lay in a layer or two add holds and do a final layer
2. reglass in old tray and new footholds, then pour foam in the old extinguisher holes. (concerned with foam causing tray to curve up)
will be my first time Glassing and may try to reinforce bondline for practice before doing the tray although it will be under the turf
(this was 2009)
I'm planning a build on my 98 sxi pro to install footholds and refoam and will be doing a few other things while its all ripped apart
in all i will be doing these things
1. New foam (sealing everything and maybe glassing inside rail)
2. Footholds
3. closing holes from fire extinguisher tubes
4. installing a footstrap
5. sealing leaky holes from removed hull extensions (i'm gonna put threaded inserts in so i can take them on and off)
6. turfing
i'm only in the planning process and want to be prepared so don't have to go back in and redo anything.
my main question involves the tray,foam,and footholds.
i have seen a few ways of doing the main parts but i wonder what you all think the best way to do it is
1. Pour foam,shape for tray, lay down a new tray, then do a traditional install for the footholds.
1b. pour foam shape for holds and tray. then lay in a layer or two add holds and do a final layer
2. reglass in old tray and new footholds, then pour foam in the old extinguisher holes. (concerned with foam causing tray to curve up)
will be my first time Glassing and may try to reinforce bondline for practice before doing the tray although it will be under the turf