You know what's worse than changing out a 6600 Watt Weiss Drill Spindle? Changing it out 4 times in one shift!!!!! 



3 failed "Factory Re-manufactured" units back to back, right out of inventory.



$27K just doesn't buy what it used to.



The original unit was plain worn out after 6 years and 7,051,516 drill cycles.



The first replacement unit had the encoder fail in the first 5 minutes, (6PM),

The second must have had rust on the bearings as they started growling during the first minute of the warm up sequence, (8:30PM),



The third unit failed an internal limit switch that detects the drawbar is retracted, (11:30PM).







The fourth and final spindle I stole from one of our other machines in another building and moved it over to get this machine up and running, (3:30AM).






3 failed "Factory Re-manufactured" units back to back, right out of inventory.
$27K just doesn't buy what it used to.
The original unit was plain worn out after 6 years and 7,051,516 drill cycles.
The first replacement unit had the encoder fail in the first 5 minutes, (6PM),
The second must have had rust on the bearings as they started growling during the first minute of the warm up sequence, (8:30PM),
The third unit failed an internal limit switch that detects the drawbar is retracted, (11:30PM).
The fourth and final spindle I stole from one of our other machines in another building and moved it over to get this machine up and running, (3:30AM).