Rickster
Matakana Menace
- Location
- Bay of Plenty, NZ
Tools required:
1 Sawsall
1 four inch chisel
1 big arse hammer:bigeyes:
1 wire wheel
1 cordless drill
6 pack of favorite beverage
Time required:
1.1/2 hours to take topdeck off
.5 hours to de-foam bottom deck
:biggrin:
I was amazed at how easy the top deck was to take off, and how lousy the factory is at sealing off the foam in the rear of the hull.
Note: if you re-foam to install footholds, seal off rear exhaust and around firewall edges and fittings on the firewall well with 3M 5200 or an epoxy glue. Just because there are big gobs of green glue showing, does not mean it's sealed up.
That is where this particular ski was taking on water.:bigeyes:
1 Sawsall
1 four inch chisel
1 big arse hammer:bigeyes:
1 wire wheel
1 cordless drill
6 pack of favorite beverage
Time required:
1.1/2 hours to take topdeck off
.5 hours to de-foam bottom deck
:biggrin:
I was amazed at how easy the top deck was to take off, and how lousy the factory is at sealing off the foam in the rear of the hull.
Note: if you re-foam to install footholds, seal off rear exhaust and around firewall edges and fittings on the firewall well with 3M 5200 or an epoxy glue. Just because there are big gobs of green glue showing, does not mean it's sealed up.
That is where this particular ski was taking on water.:bigeyes: