my weekend

my wife was more in to her programs she records to hang tonight but heres a few pics . i decided to do dual oneways .one in to pump, and one out the back . i also got the left side of the front tray back in, the black stuff you see on the cooling lines and the 1 1/2 pvc for shaft and mid shaft is epoxy with black carbon pigment and silica. going to finish glassing in tonight.hope to have right side and right foothold in tomorrow.
 
Last edited:
rear right side was also reinforced using 17 oz. knytex biaxial . its hard to see the left side had a color pigment added to epoxy when done.
 

Attachments

  • DSCN1665.JPG
    DSCN1665.JPG
    63.9 KB · Views: 123
  • DSCN1662.JPG
    DSCN1662.JPG
    90 KB · Views: 132
  • DSCN1664.JPG
    DSCN1664.JPG
    67.1 KB · Views: 129
  • DSCN1663.JPG
    DSCN1663.JPG
    93.8 KB · Views: 132
Last edited:
paint the last thing on my mind. but still going to do it. i had to wait last night to finish glassing the front left in. the 5200 on the the pump dump takes 24hrs to cure :banghead: .its ready now im about to go nock it out.and work on getting the right front back in
 
Top Bottom